Hatch cover service for M/V ARTVIN

项目名称:

Hatch cover service for M/V ARTVIN

项目开始时间:

2024-06-24 14:05


项目类型:

othere

项目描述:

Received the notice from the shipowners, the hatch cover needs to be repaired.


进展:

Measure the clearance around the corner of the hatch cover and place the appropriate pad.

Measure the clearance around the corner of the hatch cover and place the appropriate pad.

Measurement the seam Measurement the middle seam(20mm) Adjusted 6mm iron block Adjusted iron block

进展:

Apply powder around the hatch cover rubber strip, close the hatch cover press powder, and then open to check the press powder.

Apply powder around the hatch cover rubber strip, close the hatch cover press powder, and then open to check the press powder.

Be-powder the rubber of the hatch cover After closed hatch cover,opened hatch cover again and checked press powder Ultrasonic inspection

进展:

Opened the cover,welding the adjusted iron block in advance and polish it, surfacing the middle seam.

Opened the cover,welding the adjusted iron block in advance and polish it, surfacing the middle seam.

Welding the iron block and polish it(+6mm) Surfacing the middle seam
 

进展:

Job done

Job done

Finally the hatch cover was closed and the 7 hatch cover were checked for sealing by ultrasonic again to check that there was no leakage.

UT again(no leakage) Middle seam no leakage(12mm)

Hatch cover service for M/V ARTVIN

项目名称:

Hatch cover service for M/V ARTVIN

项目开始时间:

2024-06-24 14:05


面积:

装修风格:

othere

装修单元类型:

Received the notice from the shipowners, the hatch cover needs to be repaired.

区域:


进展:

Measure the clearance around the corner of the hatch cover and place the appropriate pad.

Measure the clearance around the corner of the hatch cover and place the appropriate pad.

Measurement the seam Measurement the middle seam(20mm) Adjusted 6mm iron block Adjusted iron block

进展:

Apply powder around the hatch cover rubber strip, close the hatch cover press powder, and then open to check the press powder.

Apply powder around the hatch cover rubber strip, close the hatch cover press powder, and then open to check the press powder.

Be-powder the rubber of the hatch cover After closed hatch cover,opened hatch cover again and checked press powder Ultrasonic inspection

进展:

Opened the cover,welding the adjusted iron block in advance and polish it, surfacing the middle seam.

Opened the cover,welding the adjusted iron block in advance and polish it, surfacing the middle seam.

Welding the iron block and polish it(+6mm) Surfacing the middle seam
 

进展:

Job done

Job done

Finally the hatch cover was closed and the 7 hatch cover were checked for sealing by ultrasonic again to check that there was no leakage.

UT again(no leakage) Middle seam no leakage(12mm)

进展:

进展:

进展: