M/E crosshead oil delivery pipes replaced and addition supports for M/V CMA CGM BUZIOS

项目名称:

M/E crosshead oil delivery pipes replaced and addition supports for M/V CMA CGM BUZIOS

项目开始时间:

2024-06-12 15:03


项目类型:

othere

项目描述:

M-0046 M/E crosshead oil delivery pipes replaced and addition supports,M-0012 M/E modification the lo sampling pipe and new lighter type sampling valve was applied


进展:

M-0046 M/E crosshead oil delivery pipes replaced and addition supports

M-0046 M/E crosshead oil delivery pipes replaced and addition supports

1.M-0046 M/E crosshead oil delivery pipes replaced and addition supports,M-0012 M/E modification the lo sampling pipe and new lighter type sampling valve was applied
2.Make a new supports. Since the size of the old supports is too long, it may be impossible to install, so we cut off a small section of the supports, and re-welded it, and the fabricated supports can be effectively installed.

进展:

Install new pipes and supports.

Install new pipes and supports.

Adjust the position of the new pipe and install it along with the gasket and screws, after which install the new bracket and tighten the screws.

进展:

M-0012 M/E modification the lo sampling pipe and new lighter type sampling valve was applied

M-0012 M/E modification the lo sampling pipe and new lighter type sampling valve was applied

Remove the LO sampling pipe, make a hole in the bottom of the pipe using a special tools, and install a new sampling valve, and finally re-install the pipe.

进展:

Job done

Job done

M/E crosshead oil delivery pipes replaced and addition supports for M/V CMA CGM BUZIOS

项目名称:

M/E crosshead oil delivery pipes replaced and addition supports for M/V CMA CGM BUZIOS

项目开始时间:

2024-06-12 15:03


面积:

装修风格:

othere

装修单元类型:

M-0046 M/E crosshead oil delivery pipes replaced and addition supports,M-0012 M/E modification the lo sampling pipe and new lighter type sampling valve was applied

区域:


进展:

M-0046 M/E crosshead oil delivery pipes replaced and addition supports

M-0046 M/E crosshead oil delivery pipes replaced and addition supports

1.M-0046 M/E crosshead oil delivery pipes replaced and addition supports,M-0012 M/E modification the lo sampling pipe and new lighter type sampling valve was applied
2.Make a new supports. Since the size of the old supports is too long, it may be impossible to install, so we cut off a small section of the supports, and re-welded it, and the fabricated supports can be effectively installed.

进展:

Install new pipes and supports.

Install new pipes and supports.

Adjust the position of the new pipe and install it along with the gasket and screws, after which install the new bracket and tighten the screws.

进展:

M-0012 M/E modification the lo sampling pipe and new lighter type sampling valve was applied

M-0012 M/E modification the lo sampling pipe and new lighter type sampling valve was applied

Remove the LO sampling pipe, make a hole in the bottom of the pipe using a special tools, and install a new sampling valve, and finally re-install the pipe.

进展:

Job done

Job done

进展:

进展:

进展: