M/V WAN HAI A10:Air cooler repair

项目名称:

M/V WAN HAI A10:Air cooler repair

项目开始时间:

2024-02-05 17:25


项目类型:

othere

项目描述:

Received the notice from the manufacturer, the air cooler needs to be repaired.


进展:

Remove accessories, brackets and frames for # 1 and # 2 air coolers.

Remove accessories, brackets and frames for # 1 and # 2 air coolers.

进展:

Remove No. 1 and No. 2 air coolers through the housing and place them on the deck,and polishing air cooler contact surface.

Remove No. 1 and No. 2 air coolers through the housing and place them on the deck,and polishing air cooler contact surface.

进展:

Replace and reinstall the No.1 and No.2 air coolers, and install each accessory at the same time and pay attention to the installation position

Replace and reinstall the No.1 and No.2 air coolers, and install each accessory at the same time and pay attention to the installation position

进展:

Job done

Job done

M/V WAN HAI A10:Air cooler repair

项目名称:

M/V WAN HAI A10:Air cooler repair

项目开始时间:

2024-02-05 17:25


面积:

装修风格:

othere

装修单元类型:

Received the notice from the manufacturer, the air cooler needs to be repaired.

区域:


进展:

Remove accessories, brackets and frames for # 1 and # 2 air coolers.

Remove accessories, brackets and frames for # 1 and # 2 air coolers.

进展:

Remove No. 1 and No. 2 air coolers through the housing and place them on the deck,and polishing air cooler contact surface.

Remove No. 1 and No. 2 air coolers through the housing and place them on the deck,and polishing air cooler contact surface.

进展:

Replace and reinstall the No.1 and No.2 air coolers, and install each accessory at the same time and pay attention to the installation position

Replace and reinstall the No.1 and No.2 air coolers, and install each accessory at the same time and pay attention to the installation position

进展:

Job done

Job done

进展:

进展:

进展: