项目名称:
M/V CMA CGM CONCORDE:维保
项目开始时间:
2023-12-29 14:40
项目类型:
其他
项目描述:
相关项目维保
进展:
Additional platform dg7648
According to the request all additional supports were reinforced;
New design support drawing
Before install supports
Install and welding the new support
Intervened with in use pipes
After add reinforced








进展:
Main engine auxiliary blower #02 cracks on impeller blades
Remove the motor seat
Dismantled all the bolts
Dismantled the motor from ME
Pull out old impeller from motor
Remove the cver of sealing
Clean the end cap sludge waste
Renewal sealing
New impeller
Install new impeller
Tighten/ Torque the bolt to 490Nm
Re-assembled motor with new design impeller
Measure the clearance between impeller and deflector
After testing





















进展:
High vibration: Damaged sealing oil pipe (unit #12-Fuel side GAV)
Remove the old damaged pipe
Leakage point
Install new design pipe






进展:
Job done
项目名称:
M/V CMA CGM CONCORDE:维保
项目开始时间:
2023-12-29 14:40
面积:
装修风格:
其他
装修单元类型:
相关项目维保
区域:
进展:
Additional platform dg7648
According to the request all additional supports were reinforced;
New design support drawing
Before install supports
Install and welding the new support
Intervened with in use pipes
After add reinforced








进展:
Main engine auxiliary blower #02 cracks on impeller blades
Remove the motor seat
Dismantled all the bolts
Dismantled the motor from ME
Pull out old impeller from motor
Remove the cver of sealing
Clean the end cap sludge waste
Renewal sealing
New impeller
Install new impeller
Tighten/ Torque the bolt to 490Nm
Re-assembled motor with new design impeller
Measure the clearance between impeller and deflector
After testing





















进展:
High vibration: Damaged sealing oil pipe (unit #12-Fuel side GAV)
Remove the old damaged pipe
Leakage point
Install new design pipe






进展:
Job done
进展:
进展:
进展: