项目名称:
M/V CMA CGM GREENLAND:相关项目维保
项目开始时间:
2023-12-29 12:13
项目类型:
其他
项目描述:
相关项目维保
进展:
PIPE BRACKET FOR LUB OUILL PIPING CYL 7
M-0469 PIPE BRACKET FOR LUB OUILL PIPING CYL 7
Drill 6mm hole and add install new bracket.
Drill 6mm hole on liner After install bracket



进展:
M-0380 M/E SCAV AIR COOLER BRACKETS REPLACEMENT
M-0469 PIPE BRACKET FOR LUB OUILL PIPING CYL 7
Drill 6mm hole and add install new bracket.
Drill 6mm hole on liner After install bracket



进展:
M-0380 M/E SCAV AIR COOLER BRACKETS REPLACEMENT
New type supports and new gaskets were delivery on board at QingDao
Dismantled FWD &AFT cover and remove old gaskets
Install new type support
After replace new type support
After install new gasket and close cover
After closed cover plate No.1
Replace new type support No.2
After change new gasket
After close cover FWD &AFT
After dismantled cover plate No.3
Cleaning cover plate
Replace new type support
After closed AFT cover plate
After closed FWD cover plate No.3
The old supports were collected and left on board


















进展:
M-0490 TOP BRACING 4 CONNET BE ADJUSTED
Close the pressure regulating valve and release oil pressure
Loose adjustable locknut adjust outside indicator color column and show it to 2/E.








项目名称:
M/V CMA CGM GREENLAND:相关项目维保
项目开始时间:
2023-12-29 12:13
面积:
装修风格:
其他
装修单元类型:
相关项目维保
区域:
进展:
PIPE BRACKET FOR LUB OUILL PIPING CYL 7
M-0469 PIPE BRACKET FOR LUB OUILL PIPING CYL 7
Drill 6mm hole and add install new bracket.
Drill 6mm hole on liner After install bracket



进展:
M-0380 M/E SCAV AIR COOLER BRACKETS REPLACEMENT
M-0469 PIPE BRACKET FOR LUB OUILL PIPING CYL 7
Drill 6mm hole and add install new bracket.
Drill 6mm hole on liner After install bracket



进展:
M-0380 M/E SCAV AIR COOLER BRACKETS REPLACEMENT
New type supports and new gaskets were delivery on board at QingDao
Dismantled FWD &AFT cover and remove old gaskets
Install new type support
After replace new type support
After install new gasket and close cover
After closed cover plate No.1
Replace new type support No.2
After change new gasket
After close cover FWD &AFT
After dismantled cover plate No.3
Cleaning cover plate
Replace new type support
After closed AFT cover plate
After closed FWD cover plate No.3
The old supports were collected and left on board


















进展:
M-0490 TOP BRACING 4 CONNET BE ADJUSTED
Close the pressure regulating valve and release oil pressure
Loose adjustable locknut adjust outside indicator color column and show it to 2/E.








进展:
进展:
进展: