项目名称:
M/V CMA CGM LOUVRE:维保
项目开始时间:
2023-11-02 00:00
项目类型:
其他
项目描述:
M/V CMA CGM LOUVRE 维保
进展:
Additional platform DG 7648
According to the request additional supports were reinforced 4pcs,2pcs has been done by shipside

New design support drawing

Lay fire blankets for Protective ME cable

Before install support, has been support 3 areas

Welding support and grinding

After reinforced
进展:
Insulation material for exhaust valve expansion piece
#1..#5.#7.#8 has been change insulation by crew ,but not suitable with new cover ,need to be replace #2.#3.#4.#6.#9.#10.#11.#12 insulation damage need to be renewal
Existing insulation and cover
#2.#3.#4.#6.#9.#10.#11.#12 insulation was damage
Remove damaged insulation
Renewal insulation

进展:
replace new insulation and Install new design cover piece
#1..#5.#7.#8 insulation not suitable with new design cover, replace new insulation
Install new design cover piece #1--#12






进展:
Job done
After install cover piece




项目名称:
M/V CMA CGM LOUVRE:维保
项目开始时间:
2023-11-02 00:00
面积:
装修风格:
其他
装修单元类型:
M/V CMA CGM LOUVRE 维保
区域:
进展:
Additional platform DG 7648
According to the request additional supports were reinforced 4pcs,2pcs has been done by shipside

New design support drawing

Lay fire blankets for Protective ME cable

Before install support, has been support 3 areas

Welding support and grinding

After reinforced
进展:
Insulation material for exhaust valve expansion piece
#1..#5.#7.#8 has been change insulation by crew ,but not suitable with new cover ,need to be replace #2.#3.#4.#6.#9.#10.#11.#12 insulation damage need to be renewal
Existing insulation and cover
#2.#3.#4.#6.#9.#10.#11.#12 insulation was damage
Remove damaged insulation
Renewal insulation

进展:
replace new insulation and Install new design cover piece
#1..#5.#7.#8 insulation not suitable with new design cover, replace new insulation
Install new design cover piece #1--#12






进展:
Job done
After install cover piece




进展:
进展:
进展: