Anchor chain repair work for M/V Kota Emerald

项目开始时间:

2025-03-14 10:44


项目类型:

othere

项目描述:

As report from shipside there is D-SHACKLE pin of chain shack went out . Arranged repair team when vessel port staying time at Shekou terminal


进展:

Details Of Service

Details Of Service

As report from shipside there is D-SHACKLE pin of chain shack went out . Arranged repair team when vessel port staying time at Shekou terminal
aa. First arrangement when port staying time : Arranged big barge to terminal    job could not do due to port Authorities not allowed team on board
bb. Second time arranged when vessel completed terminal shifting: Due to anchor pin is outside ,and could not release .( New repair plan had to be done)
1.Fabricated big wire 6pcs with big shackles at workshop urgently then made fast t with anchor end shackle
2.Released anchor chain . Moved main pin to position
3.Welded main pins with shackle to ensure enough safe
4.Released anchor chain on barge .Removed the pin & old lead seals
5.Installed pin properly with other 8pcs small pins then filled lead seals
6.Stbd side anchor lift on barge for further inspection & found normally
7.Heavy up testing

进展:

Picture Report

Picture Report

进展:

Inspect and repair

Inspect and repair

The initial state : The pin almost went out .And can not release chain to done side for further repair
The condition which made fast upper
To arrange technician went inside the hawse pipe for inspection and made fast from end shackle of anchor
The drawing of shackles
Released anchor with parts of the chains including joining shackle on barge . Renewal of taper pins as below indication from manufacture . Filled Lead seals followed indication of manufacture

进展:

Job done

Job done

Anchor chain repair work for M/V Kota Emerald

项目名称:

Anchor chain repair work for M/V Kota Emerald

项目开始时间:

2025-03-14 10:44


面积:

装修风格:

othere

装修单元类型:

As report from shipside there is D-SHACKLE pin of chain shack went out . Arranged repair team when vessel port staying time at Shekou terminal

区域:


进展:

Details Of Service

Details Of Service

As report from shipside there is D-SHACKLE pin of chain shack went out . Arranged repair team when vessel port staying time at Shekou terminal
aa. First arrangement when port staying time : Arranged big barge to terminal    job could not do due to port Authorities not allowed team on board
bb. Second time arranged when vessel completed terminal shifting: Due to anchor pin is outside ,and could not release .( New repair plan had to be done)
1.Fabricated big wire 6pcs with big shackles at workshop urgently then made fast t with anchor end shackle
2.Released anchor chain . Moved main pin to position
3.Welded main pins with shackle to ensure enough safe
4.Released anchor chain on barge .Removed the pin & old lead seals
5.Installed pin properly with other 8pcs small pins then filled lead seals
6.Stbd side anchor lift on barge for further inspection & found normally
7.Heavy up testing

进展:

Picture Report

Picture Report

进展:

Inspect and repair

Inspect and repair

The initial state : The pin almost went out .And can not release chain to done side for further repair
The condition which made fast upper
To arrange technician went inside the hawse pipe for inspection and made fast from end shackle of anchor
The drawing of shackles
Released anchor with parts of the chains including joining shackle on barge . Renewal of taper pins as below indication from manufacture . Filled Lead seals followed indication of manufacture

进展:

Job done