项目名称:
Replace the crosshead slider for M/V OOCL PORTUGAL
项目开始时间:
2026-11-05 16:06
项目类型:
othere
项目描述:
At ship's request, the ours service team conducted the service on board OOCL PORTUGAL in Shanghai Port on 2026.3.14.
进展:
Check and dismantle cross head bolts and accessory
1.1The new slider is lifted and transported to the M/E platform.
1.2Hydraulic tools are used to disassemble accessories such as the cross head guide plate, slider guard plate, and stopper.






进展:
Old slider lifted down M/E platform


进展:
Install new slider and test
1. Inspection of new crosshead slipper and clean.
2.Use a hand chain hoist to lift the new crosshead slipper and align it with the installation position, then use hydraulic tools to install accessories such as stoppers, locating pins, and guard plates.








进展:
Job done
项目名称:
Replace the crosshead slider for M/V OOCL PORTUGAL
项目开始时间:
2026-11-05 16:06
面积:
装修风格:
othere
装修单元类型:
At ship's request, the ours service team conducted the service on board OOCL PORTUGAL in Shanghai Port on 2026.3.14.
区域:
进展:
Check and dismantle cross head bolts and accessory
1.1The new slider is lifted and transported to the M/E platform.
1.2Hydraulic tools are used to disassemble accessories such as the cross head guide plate, slider guard plate, and stopper.






进展:
Old slider lifted down M/E platform


进展:
Install new slider and test
1. Inspection of new crosshead slipper and clean.
2.Use a hand chain hoist to lift the new crosshead slipper and align it with the installation position, then use hydraulic tools to install accessories such as stoppers, locating pins, and guard plates.








进展:
Job done
进展:
进展:
进展: