ME Fuel pump overhaul for M/V Canal

项目名称:

ME Fuel pump overhaul for M/V Canal

项目开始时间:

2025-12-12 15:26


项目类型:

M/E Overhaul

项目描述:

As requested, our service team attended the subject vessel between 20th nov & 21th nov . During her berthing at Jingtang terminal, China. The reason for attendance was to provide service for ME fuel pump overhaul.


进展:

All work done listed

All work done listed

All work done listed as below:

  1. 1.Pre‑maintenance prep: Implemented lockout‑tagout (LOTO) on main engine system to isolate oil & power. Cleaned fuel pump surface & prepped spares (oil seals, filter elements, bearings).

  2. 2.Disassembly & inspection: Dismantled pump per safety manual. Inspected gear teeth – no wear pitting/deformation. Measured gear clearance (feeler gauge): within std. 0.15–0.25 mm. Left‑end bearing slightly loose. Oil seal aged/cracked; filter clogged with metal particles.

  3. 3.Component maintenance & replacement: Replaced loose bearing, aged oil seal & clogged filter. Cleaned pump body, oil passages & suction pipe with diesel to remove residues. Replaced pump barrel. Applied sealant to pump cover joint to prevent leakage.

  4. 4.Reassembly: Reassembled components in reverse order. Torqued bolts to spec to avoid uneven pump body stress.

  5. 5.Test: Ran 30 min observation – no leakage. Pump noise normal, operation smooth, no abnormal vibration.

    Photos for reference:

进展:

Maintenance of the fuel pump

Maintenance of the fuel pump

进展:

Maintenance of the fuel pump (No.4-No.6)

Maintenance of the fuel pump (No.4-No.6)

进展:

Job done

Job done
ME Fuel pump overhaul for M/V Canal

项目名称:

ME Fuel pump overhaul for M/V Canal

项目开始时间:

2025-12-12 15:26


面积:

装修风格:

M/E Overhaul

装修单元类型:

As requested, our service team attended the subject vessel between 20th nov & 21th nov . During her berthing at Jingtang terminal, China. The reason for attendance was to provide service for ME fuel pump overhaul.

区域:


进展:

All work done listed

All work done listed

All work done listed as below:

  1. 1.Pre‑maintenance prep: Implemented lockout‑tagout (LOTO) on main engine system to isolate oil & power. Cleaned fuel pump surface & prepped spares (oil seals, filter elements, bearings).

  2. 2.Disassembly & inspection: Dismantled pump per safety manual. Inspected gear teeth – no wear pitting/deformation. Measured gear clearance (feeler gauge): within std. 0.15–0.25 mm. Left‑end bearing slightly loose. Oil seal aged/cracked; filter clogged with metal particles.

  3. 3.Component maintenance & replacement: Replaced loose bearing, aged oil seal & clogged filter. Cleaned pump body, oil passages & suction pipe with diesel to remove residues. Replaced pump barrel. Applied sealant to pump cover joint to prevent leakage.

  4. 4.Reassembly: Reassembled components in reverse order. Torqued bolts to spec to avoid uneven pump body stress.

  5. 5.Test: Ran 30 min observation – no leakage. Pump noise normal, operation smooth, no abnormal vibration.

    Photos for reference:

进展:

Maintenance of the fuel pump

Maintenance of the fuel pump

进展:

Maintenance of the fuel pump (No.4-No.6)

Maintenance of the fuel pump (No.4-No.6)

进展:

Job done

Job done

进展:

进展:

进展: