项目名称:
HN2007 repair for M/V BH PROGRESS
项目开始时间:
2025-07-08 11:57
项目类型:
othere
项目描述:
Upon the vessel's request, SEASAVE service team arrived at Fujian Matsushita Port on July 1, 2025 to perform maintenance on the oil mist separator for the aft funnel ventilation duct and the hydraulic jacks for the two top covers at the aft cargo hold.
进展:
M008 Oil mist header for the rear chimney ventilation pipe repair


进展:
Set up the hoisting cage and weld the oil collection trough.




进展:
H0027 Jacks for the two top covers at the rear of the cargo hold repair.
1.Inspect and cut Angle irons.
2.Weld the oil collection trough and paint it.





进展:
Jobs done

项目名称:
HN2007 repair for M/V BH PROGRESS
项目开始时间:
2025-07-08 11:57
面积:
装修风格:
othere
装修单元类型:
Upon the vessel's request, SEASAVE service team arrived at Fujian Matsushita Port on July 1, 2025 to perform maintenance on the oil mist separator for the aft funnel ventilation duct and the hydraulic jacks for the two top covers at the aft cargo hold.
区域:
进展:
M008 Oil mist header for the rear chimney ventilation pipe repair


进展:
Set up the hoisting cage and weld the oil collection trough.




进展:
H0027 Jacks for the two top covers at the rear of the cargo hold repair.
1.Inspect and cut Angle irons.
2.Weld the oil collection trough and paint it.





进展:
Jobs done

进展:
进展:
进展: