According to the ship information provided by the owner,the Bonding bridge damage needs to be repair, so from the SEASAVE service team were at the port of Nansha to Singapore on 2025.5.14th-20th to carry out the repair work.


进展:

Inspect and confirm the damaged area

Inspect and confirm the damaged area, and prepare safe construction conditions and fire prevention work.

进展:

Weld and bind the bridge

Rust removal and cleaning of the surface of the damaged parts, cutting, welding and polishing the binding bridge

进展:

After welding

After welding

进展:

Job done

Job done

Bonding bridge repair for M/V KOTA OASIS

项目名称:

Bonding bridge repair for M/V KOTA OASIS

项目开始时间:

2025-05-27 16:18


面积:

装修风格:

othere

装修单元类型:

According to the ship information provided by the owner,the Bonding bridge damage needs to be repair, so from the SEASAVE service team were at the port of Nansha to Singapore on 2025.5.14th-20th to carry out the repair work.

区域:


进展:

Inspect and confirm the damaged area

Inspect and confirm the damaged area, and prepare safe construction conditions and fire prevention work.

进展:

Weld and bind the bridge

Rust removal and cleaning of the surface of the damaged parts, cutting, welding and polishing the binding bridge

进展:

After welding

After welding

进展:

Job done