Due to the port side accommodation ladder damaged last voyage . Inspection team was arranged for inspection .
进展:
Upper platform condition : Need to remove the upper platform including pin
Details Of Service
Due to the port side accommodation ladder damaged last voyage . Inspection team was arranged for inspection .
-To check the upper condition
-To check the hoisting winch /davit condition.
-Taking measurement of ladder & winch damaged parts







进展:
Davit/Winch deformed : Foundation eyes *2pcs & Long shaft * 1pc needed to fabricate . The davit moved from original position needed to be rectified







进展:
New ladder installing plan :Sample as another vessel






进展:
Job done
项目名称:
ACC. LADDER Inspection for M/V ONE MATRIX
项目开始时间:
2024-09-14 14:17
面积:
装修风格:
othere
装修单元类型:
Due to the port side accommodation ladder damaged last voyage . Inspection team was arranged for inspection .
区域:
进展:
Upper platform condition : Need to remove the upper platform including pin
Details Of Service
Due to the port side accommodation ladder damaged last voyage . Inspection team was arranged for inspection .
-To check the upper condition
-To check the hoisting winch /davit condition.
-Taking measurement of ladder & winch damaged parts







进展:
Davit/Winch deformed : Foundation eyes *2pcs & Long shaft * 1pc needed to fabricate . The davit moved from original position needed to be rectified







进展:
New ladder installing plan :Sample as another vessel






进展:
Job done
进展:
进展: