Windlass repair for M/V BILLIE

项目名称:

Windlass repair for M/V BILLIE

项目开始时间:

2024-08-04 12:33


项目类型:

othere

项目描述:

As Requested, Our Service Team Attended The Subject Vessel On 22th—25th Jule 2024, During Her Alongside At Wusong Port SHA China. The Reason For Attendance Was Provide Service For Windlass Repair Job.


进展:

Fabricated hoisting frame and special tools with I-bars Remove/assemble drum from windlass body

Fabricated hoisting frame and special tools with I-bars Remove/assemble drum from windlass body

进展:

Take measurements for shaft and bush hole, found the bush hole was out-of-round urgent arranged chain drum to workshop for boring

Take measurements for shaft and bush hole, found the bush hole was out-of-round urgent arranged chain drum to workshop for boring

进展:

PT for chain drum and Anchor test

PT for chain drum and Anchor test

进展:

Job done

Job done

Windlass repair for M/V BILLIE

项目名称:

Windlass repair for M/V BILLIE

项目开始时间:

2024-08-04 12:33


面积:

装修风格:

othere

装修单元类型:

As Requested, Our Service Team Attended The Subject Vessel On 22th—25th Jule 2024, During Her Alongside At Wusong Port SHA China. The Reason For Attendance Was Provide Service For Windlass Repair Job.

区域:


进展:

Fabricated hoisting frame and special tools with I-bars Remove/assemble drum from windlass body

Fabricated hoisting frame and special tools with I-bars Remove/assemble drum from windlass body

进展:

Take measurements for shaft and bush hole, found the bush hole was out-of-round urgent arranged chain drum to workshop for boring

Take measurements for shaft and bush hole, found the bush hole was out-of-round urgent arranged chain drum to workshop for boring

进展:

PT for chain drum and Anchor test

PT for chain drum and Anchor test

进展:

Job done

Job done

进展:

进展:

进展: