No.1 D/G Overhaul for M/V MINOAN DIGNITY

项目名称:

No.1 D/G Overhaul for M/V MINOAN DIGNITY

项目开始时间:

2024-07-29 16:15


项目类型:

A/E Overhaul

项目描述:

According to the requirements of the owner, our service team overhauled the No.1 D/G of "MINOAN DIGNITY" at Qingdao BEIHAI Shipyard on July 5, 2024.


进展:

D/G 1 Overhaul Process

D/G 1 Overhaul Process

  According to the requirements of the owner, our service team overhauled the No.1 D/G of "MINOAN DIGNITY" at Qingdao BEIHAI Shipyard on July 5, 2024.Process follows:
 - Stop running No.1 D/G,remove accessories and pipes,remove cylinder cover,piston and connecting rod.
 - Remove smoke main,supercharger,oil cooler,sea water cooler,oil pump,sea water pump,free end gear box cover.
 - Remove crankshaft,main bearing and main bearing shell,disassemble the connecting rod bearing,connecting rod shell.
 - Cleaning the piston,connecting rod,cover,main bearing and main bearing shell,cleaning the valve seat/rod.
 - Lapping the valve seat/rod,and replaced the No.4 four valve rod and two seats,measuring various data,including:liner,piston ring,old piston pin,piston,connecting rod big end and small end,old main bearing shell.
 - Replaced the unit No.3  liner and  cleaning unit NO 1,2,4,5 liner and replaced o-ring.
 - Cleaning the crank case,measurement new main bearing and install,assemble the new thrust block(total 4 pieces),reinstall crankshaft and pedestal frame.
 - Remove and clean the flywheel and bolts before installation. 
 - Clean plate cold,reinstall exhaust manifold,supercharger,plate cold,oil pump,sea water pump,free end gear box end cover.Cylinder cover pressure test,test no leakage.
 - All piston rings are replaced,No.1 and No.5 pistons are replaced;Replaced No.2,4 and 5 piston pins and measure new piston 
 pins;The big end of the connecting rod is replaced;Connecting rod bolts were replaced,a total of 20;Reinstall connecting rod,piston and cylinder cover and lubrication.
 - Install various pipes and accessories;Install the rocker arm and measure the adjustment gap;Measuring the crankshaft;Repack insulation.
 - Running test(water test and oil test);No-load and load operation.
 - RMK:All replacement parts are based on measurement results;All the measurements are shown in the attached table.

进展:

Decommission No.1 D/G, dismantle components including the cylinder cover, piston, and connecting rod, and remove associated pipes.

Decommission No.1 D/G, dismantle components including the cylinder cover, piston, and connecting rod, and remove associated pipes.

进展:

Overhaul the engine by replacing the crankshaft, bearings, piston rings, and other worn parts

Overhaul the engine by replacing the crankshaft, bearings, piston rings, and other worn parts

进展:

Reassemble the engine, conduct pressure tests, and perform operational tests to ensure functionality and safety.

Reassemble the engine, conduct pressure tests, and perform operational tests to ensure functionality and safety.

No.1 D/G Overhaul for M/V MINOAN DIGNITY

项目名称:

No.1 D/G Overhaul for M/V MINOAN DIGNITY

项目开始时间:

2024-07-29 16:15


面积:

装修风格:

A/E Overhaul

装修单元类型:

According to the requirements of the owner, our service team overhauled the No.1 D/G of "MINOAN DIGNITY" at Qingdao BEIHAI Shipyard on July 5, 2024.

区域:


进展:

D/G 1 Overhaul Process

D/G 1 Overhaul Process

  According to the requirements of the owner, our service team overhauled the No.1 D/G of "MINOAN DIGNITY" at Qingdao BEIHAI Shipyard on July 5, 2024.Process follows:
 - Stop running No.1 D/G,remove accessories and pipes,remove cylinder cover,piston and connecting rod.
 - Remove smoke main,supercharger,oil cooler,sea water cooler,oil pump,sea water pump,free end gear box cover.
 - Remove crankshaft,main bearing and main bearing shell,disassemble the connecting rod bearing,connecting rod shell.
 - Cleaning the piston,connecting rod,cover,main bearing and main bearing shell,cleaning the valve seat/rod.
 - Lapping the valve seat/rod,and replaced the No.4 four valve rod and two seats,measuring various data,including:liner,piston ring,old piston pin,piston,connecting rod big end and small end,old main bearing shell.
 - Replaced the unit No.3  liner and  cleaning unit NO 1,2,4,5 liner and replaced o-ring.
 - Cleaning the crank case,measurement new main bearing and install,assemble the new thrust block(total 4 pieces),reinstall crankshaft and pedestal frame.
 - Remove and clean the flywheel and bolts before installation. 
 - Clean plate cold,reinstall exhaust manifold,supercharger,plate cold,oil pump,sea water pump,free end gear box end cover.Cylinder cover pressure test,test no leakage.
 - All piston rings are replaced,No.1 and No.5 pistons are replaced;Replaced No.2,4 and 5 piston pins and measure new piston 
 pins;The big end of the connecting rod is replaced;Connecting rod bolts were replaced,a total of 20;Reinstall connecting rod,piston and cylinder cover and lubrication.
 - Install various pipes and accessories;Install the rocker arm and measure the adjustment gap;Measuring the crankshaft;Repack insulation.
 - Running test(water test and oil test);No-load and load operation.
 - RMK:All replacement parts are based on measurement results;All the measurements are shown in the attached table.

进展:

Decommission No.1 D/G, dismantle components including the cylinder cover, piston, and connecting rod, and remove associated pipes.

Decommission No.1 D/G, dismantle components including the cylinder cover, piston, and connecting rod, and remove associated pipes.

进展:

Overhaul the engine by replacing the crankshaft, bearings, piston rings, and other worn parts

Overhaul the engine by replacing the crankshaft, bearings, piston rings, and other worn parts

进展:

Reassemble the engine, conduct pressure tests, and perform operational tests to ensure functionality and safety.

Reassemble the engine, conduct pressure tests, and perform operational tests to ensure functionality and safety.