As the required of CMA CGM, CMD service team attended on subject vessel CMA CGM SORBONNE during YangShan port on 25th --27 th June,2024.NingBo port on 21th,Mar,2024


进展:

Claim M-0975: M/E for #6-#7 pressure pipes connect. Block support broken

Claim M-0975: M/E for #6-#7 pressure pipes connect. Block support broken

Supply new support beam;Dismantled HP pipes and attached;Dismantled/remove valve blocks;Remove damaged beam and shifting to platform;Install new support beam;After assembled HP pipe & handrails & tighten torque bolts to 80Nm

进展:

Claim No.11 Cooling water pipe leakage and Claim Flywheel end fuel side weld oil leak

Claim No.11 Cooling water pipe leakage and Claim Flywheel end fuel side weld oil leak

Fabricated new pipe and replacement Remove old pipe;Old pipe;Fabricated new pipe and installation;Leakage  point;Repair by Belzone

Repair the leakage point by Belzona

进展:

Claim M-1039 ME top bracing n°3 damaged - internal breakage

Claim M-1039 ME top bracing n°3 damaged - internal breakage

进展:

Job done

Job done

Claim M-0951 M/E beam above FOP & SOP cracked and Claim M-0994 Cylinder lubrification copper pipe wear

Welding the crack and grinding.

Unit No.1-12 Isolate the interference position with Teflon gasket

Finish the warranty claims for M/V CMA CGM SORBONNE

项目名称:

Finish the warranty claims for M/V CMA CGM SORBONNE

项目开始时间:

2024-07-15 16:01


面积:

装修风格:

othere

装修单元类型:

As the required of CMA CGM, CMD service team attended on subject vessel CMA CGM SORBONNE during YangShan port on 25th --27 th June,2024.NingBo port on 21th,Mar,2024

区域:


进展:

Claim M-0975: M/E for #6-#7 pressure pipes connect. Block support broken

Claim M-0975: M/E for #6-#7 pressure pipes connect. Block support broken

Supply new support beam;Dismantled HP pipes and attached;Dismantled/remove valve blocks;Remove damaged beam and shifting to platform;Install new support beam;After assembled HP pipe & handrails & tighten torque bolts to 80Nm

进展:

Claim No.11 Cooling water pipe leakage and Claim Flywheel end fuel side weld oil leak

Claim No.11 Cooling water pipe leakage and Claim Flywheel end fuel side weld oil leak

Fabricated new pipe and replacement Remove old pipe;Old pipe;Fabricated new pipe and installation;Leakage  point;Repair by Belzone

Repair the leakage point by Belzona

进展:

Claim M-1039 ME top bracing n°3 damaged - internal breakage

Claim M-1039 ME top bracing n°3 damaged - internal breakage

进展:

Job done

Job done

Claim M-0951 M/E beam above FOP & SOP cracked and Claim M-0994 Cylinder lubrification copper pipe wear

Welding the crack and grinding.

Unit No.1-12 Isolate the interference position with Teflon gasket

进展:

进展: